Tillberga railway adaptation

SWECSA has been commissioned to build a bridge-like structure over the Tillbergas railway and this adaptation consists of:

  • Inventory of management data and canalisation.
  • Measurements for data and soil.
  • Geotechnical analyses on soil and ground.
    Some of the project objectives are to contribute to the reduction of emissions, a safe working environment and that traffic is not disturbed other than at scheduled times.