SWECSA has been commissioned to build a bridge-like structure over the Tillbergas railway and this adaptation consists of:
- Inventory of management data and canalisation.
- Measurements for data and soil.
- Geotechnical analyses on soil and ground.
Some of the project objectives are to contribute to the reduction of emissions, a safe working environment and that traffic is not disturbed other than at scheduled times.