SWECSA has been commissioned to establish a charging facility for Elbussar Malmö.
The mission consists of the following process:
- Inspection for the groundwork.
- Stormwater study to be considered.
- Control against the detailed plan.
- Connection to existing heights is checked.
- Co-ordination with other technical areas, such as design of water and sewage systems and control of existing water and sewage systems.