The existing fibre network along the railway has passed its technical lifespan. To ensure future needs, Trafikverket is upgrading the fibre network with cable that covers today's needs and is prepared for increased demands on network capacity. During 2021 - 2023 we assisted Systra AB in Opto 2.0 Hässleholm. Swecsa was technically responsible for Land, Measurement, Geotechnics & Management coordination.