Anderstorp 9:233, Bridge to Bridge - Stormwater and cloudburst survey

SWECSA AB has, on behalf of Gislaved municipality, carried out a stormwater investigation with cloudburst mapping for the local plan Bro to Bro, Anderstorp 9:233. The purpose of the investigation was to enable the exploitation of a new swimming pool and included mapping of catchment areas, recipient impact, stormwater flows, flow simulations, proposed measures and consequences of proposed measures. In the investigation, design stormwater flows were calculated before and after exploitation to identify a delay need. In addition, the web-based tool ScalGo Live was used to locate local accumulation points and flow paths for stormwater.

The local plan Bro to Bro aims to enable the construction of housing and premises in the centre of Anderstorp. According to the plan proposal, a new residential neighbourhood will be built, whose current name is Bastuberget. The block consists of residential buildings in 4 to 8 floors with an underground car park, outdoor gym, greenhouse and business activities.